Delivery Of 8 Milk Tanks For A Diary Factory In Romania

Route: from Niort, France to Brasov, Romania

Industry: Food & Beverage

Project Highlights: The project scope was the delivery of 8 milk tanks from Niort, France to a new built factory in Brasov, Romania. Each tank was 4 meter high, 4.20 meter wide and 9 meter long, weighing 15 tons. Project was done in the time box set by our client, while the transport of each tank was carefully executed.